«The inspection came back passed»
How it shows up
The inspection report says "passed", the batch ships. Some of the pieces that reach the end customer still show the defect the inspection should have caught.
Why it happens
A sampling inspection does not check one hundred per cent of the batch: it checks a statistically defined portion and accepts the batch if defects stay below a threshold agreed in advance. Since 1999 that threshold has been called the acceptance quality limit (AQL), not the acceptable quality level: it is the maximum tolerated, not a level to be regarded as acceptable. "Passed" does not mean zero defects: it means defects below the chosen threshold. If the threshold is loose, or if critical, major and minor defects have not been distinguished, the inspection protects you less than it appears to.
The signal to catch
An inspection report that gives only the final outcome, without stating the standard and the sampling plan used, the sample size and the acceptance limits applied for each defect category.
What to do
Set out in writing, before the order, the sampling standard and the limits for each defect category: ISO 2859-1, general inspection level II, separate AQLs for critical, major and minor defects. Do not leave them to the inspector's discretion on the day of the inspection.
Note The sampling plan is the one set out in ISO 2859-1:1999, adopted in Italy as UNI ISO 2859-1. The American equivalent, ANSI/ASQ Z1.4, is similar but not interchangeable: if the contract does not say which of the two applies, the inspector decides. Source: ISO 2859-1:1999, iso.org/standard/1141.html.
The clusters where this mistake costs most
The sector does not change the nature of the mistake, it changes what you pay when it happens. In these clusters the entry comes up more often: if you are looking at one of these areas, read the signal again before you leave.
Other entries in the same family
The other entries gathered under Product and quality. Different mistakes, same root.
Where this entry comes from
We would rather state what we do not know than round it off.
- How it is built
- From the field: what we have seen inside factories and when containers were opened, and what clients told us.
- Why there are no names
- Entries are anonymised. Company, supplier and personal names stay out of it, out of respect for the confidentiality of those who told us their story: the judgement can be shared, the name cannot.
- How it grows
- The Register gets longer with every trip. When an entry is added, or when an entry changes because a rule has changed, the date below moves.
- Entry updated on
- 03/08/2026
An entry in the Register is not advice on your case. It describes a recurring mechanism and says where to start looking: checking your product, your contract and your supplier still has to be done, and it has to be done with someone who can sign off on it.
We don't take on every project that comes our way
We take on one project at a time, because we go in person and we travel with you. Before we talk about quotes, we check whether the project stands up, and if it doesn't, we tell you straight away.