«The supplier we approved is the one that made the goods»
How it shows up
The audit was carried out, the factory is the right one, the first batch matches the specification. Then a surprise check, or more often a minor detail, a seam, a label, a dimensional tolerance, reveals that part of the production came out of a plant you never visited and never approved. You notice when the defect has no explanation inside the factory you know.
Why it happens
An order larger than the capacity free at that moment, or a tight deadline, pushes the approved supplier to pass part of the work to a third party. The margin stays with them, the quality risk moves to a plant you have never inspected. Declaring it would mean renegotiating the schedule with you, or risking the loss of the order: not declaring it is simpler.
The signal to catch
Variations from one batch to another from the same supplier, in details that do not depend on the product recipe (secondary packaging, markings, tolerances), without you having changed the specification.
What to do
The contract must prohibit unauthorised subcontracting and require a written declaration of every plant involved in production, before the order, not after the complaint.
The clusters where this mistake costs most
The sector does not change the nature of the mistake, it changes what you pay when it happens. In these clusters the entry comes up more often: if you are looking at one of these areas, read the signal again before you leave.
Other entries in the same family
The other entries gathered under Supplier. Different mistakes, same root.
Where this entry comes from
We would rather state what we do not know than round it off.
- How it is built
- From the field: what we have seen inside factories and when containers were opened, and what clients told us.
- Why there are no names
- Entries are anonymised. Company, supplier and personal names stay out of it, out of respect for the confidentiality of those who told us their story: the judgement can be shared, the name cannot.
- How it grows
- The Register gets longer with every trip. When an entry is added, or when an entry changes because a rule has changed, the date below moves.
- Entry updated on
- 03/08/2026
An entry in the Register is not advice on your case. It describes a recurring mechanism and says where to start looking: checking your product, your contract and your supplier still has to be done, and it has to be done with someone who can sign off on it.
We don't take on every project that comes our way
We take on one project at a time, because we go in person and we travel with you. Before we talk about quotes, we check whether the project stands up, and if it doesn't, we tell you straight away.